Attendance in pounds icon

Project Tags:

Trading

Listed

In Progress

Listed

Product benefits

Technological upgrade

We will implement a new network design and state-of-the-art equipment specifically for electronic trading environments.

B3’s technological upgrade project for its electronic trading and co-location environment will provide the following:

  • Physical segregation of the Market Data network from the Order Entry network.
  • Increased observability coverage for Order Entry, now encompassing the entire flow of B3’s investors' messages.
  • A reduction in total network latency of over 30%, in addition to increased determinism of the environment.

 

 

 

 

 Before migrating to the new network, it will be ESSENTIAL to evaluate the items below:

 

  • Current Infrastructure: Conduct a thorough assessment of the current network infrastructure, including racks, switches, servers, and other devices connected to the B3 trading link.
  • Identification of Existing Ports: Map all ports of switches and servers currently connected to the access switches to the B3 negotiation network.
  • Capacity Analysis: Evaluate the capacity of available switch, server, and gbics ports to ensure that there is enough space and transceivers for the new network.
  • Port Reservation: Reserve the ports needed for migration, ensuring that they are not used for other purposes during the transition process.

 The availability of ports should be made as shown in the example below:

 

Rack quantity

Number of trading links (current)
Number of ports that should be made available on the switch for testing on the new network

 

Final total ports (during the migration period)

1x 1/2 rack

1 pair (2 ports)

+ 2 pairs (4 ports)

3 pairs (6 ports)

4x 1/2 racks

4 pairs (8 ports)

+ 8 pairs (16 ports)

12 pairs (24 ports)

 

 

 

 

 

 

 

Important:

  • Plan the transition in advance to avoid disruptions to trading services and ensure a smooth migration.
  • Coordinate with your IT team to ensure that all technical requirements are met and the migration is performed correctly.

Please refer to the documentation available on the B3 website for more details on the new Co-location trading network and how the migration will be carried out.

Timeline

  • Disclosure plan

    Go-live date to be defined.

  • Other

    Testing will begin in a simulation environment. This environment will allow for the evaluation of the connections, ensuring that all performance parameters are properly monitored and adjusted as necessary.

Technical details

  • Catalog changes

    No catalog changes

  • Main systems

    No system impacted

  • Main related functions

    No functions impacted

  • Certification roadmap

    No impact

  • What is the Sinacor version?

    No impact

Material name

Date

Material Type

Language

Format

Size

FAQ- New Trading Network - B3-EN

05/15/2025

-

-

pdf

395KB

FAQ- New Trading Network - B3_PT

05/15/2025

-

-

pdf

393KB

Workshop | New Network Architecture

05/14/2025

-

-

octet-stream

N/A

Workshop | Nova Arquitetura de Rede Co-location

05/13/2025

Conteúdo Workshop

-

octet-stream

N/A

Workshop - New COLO Network Access 2025 v1.7

05/13/2025

-

-

pdf

N/A